EL +0.00 / Ground level

Built higher.
Poured right.

Commercial and residential concrete and construction. Elevated decks, slabs, foundations, driveways and renovations, finished true and built to last.

CommercialResidentialYear round

EL +12.40 / The name

al·tu·ra(Spanish) noun: height

Height is how we measure the work. A slab that reads level on the laser. A form line that runs true for a hundred feet. A finish that still looks right twenty winters from now.

Altura Construction handles both sides of the trade: large commercial pours on elevated decks and parkades, and the driveway, sidewalk or basement at your own house. Same crew standards, whatever the size of the job.

EL +24.80 / Services

Two sides of the trade.
One standard.

Crew power-trowelling a large commercial concrete floor
01

Commercial

Pours planned around your schedule and your other trades, with the crew to place and finish big slabs in a single push.

  • Elevated decks and parkades
  • Slabs on grade, warehouse floors
  • Rebar, forming and placement
  • Power-trowel and broom finishes
New residential concrete driveway leading to a garage
02

Residential

Tear-out to final cut joints, done clean and on the date we give you. We leave the yard the way we found it.

  • Driveways and garage pads
  • Sidewalks, steps and patios
  • Foundations and footings
  • Basement development

EL +37.20 / Recent work

Straight off the job site.

Every photo here is from our own crews. No stock.

Screeding a deck pour

EL +49.60 / On site

Rain, snow or a sunset pour, the slab still gets finished.

Concrete doesn't wait. When the truck is on site our crews stay until the last pass is done, whether that's a five a.m. start or under lights after dark.

Night pour over rebar

EL +62.00 / Process

How a job runs.

  1. 01

    Walk the site

    We come out, measure, and talk through access, grades and timing. You get a clear written quote.

  2. 02

    Plan and form

    Excavation, base, forms and rebar set to drawings, checked before a single truck is booked.

  3. 03

    Pour and finish

    Placed, screeded and finished by a full crew, with the finish you picked: trowel, broom or exposed.

  4. 04

    Cure and hand over

    Joints cut, curing protected, site cleaned. We walk it with you before we call it done.

EL +74.40 / Top out

Got a pour coming up?

Tell us about the job and we'll get back to you with next steps and a site visit.

  • Call
  • Email
  • Area
Type of job